r 01- Note to Mr B D Bramley TSRT Product SuDeriority Proiect The project group has split into two halves at present: Product Development: Earl Kornhorst & Irwin Kausch Research Methodology: Flavio de Andrade & myself On the product side B&W and BATCF have met up and their conclusions are due to be debated with BATCo and Souza Cruz. I have only seen a segment of their report. On the research side conflicting priorities have bedevilled attempts for BATCo and Souza Cruz to get together but this should occur before the end of November. We then plan to hold a workshop in mid January with B&W, BATCF and ITL. The difficult bit will be trying to reconcile the views of the experts of the respective operating groups. Earl Kornhorst is visiting Venezuela during the week we are in Orlando. I A S 6 November 1991 Li'l CD r".) L11 CIN C711 BATCo document for Province of BritiSh Columbia 25 October 1999